1 Project
2 Project details
3 Add an item
Combined Bill of Quantities
Visible columns
Result type: Approximate Cost Estimate
Formulas & Assumptions
Formulas used
Qty_with_waste = Qty × (1 + Waste%)Quantity including waste per itemMaterial cost = Qty_with_waste × Material rateMaterial costLabor cost = Qty_with_waste × Labor rateLabor costRow total = Material + Labor + EquipmentItem totalSubtotal = Σ Row totalsProject subtotalContingency = Subtotal × Contingency%ContingencyVAT = (Subtotal + Contingency) × VAT% — only if enabledVAT is applied only when enabled
Assumptions & reference values
- Editable assumptionRates come from your own Price Book; no market prices are loaded automatically.
- Editable assumptionVAT is never applied unless you explicitly enable it.
- Default valueDefault contingency is 0% — adjust it to suit the project stage.
Notices: This result is intended for quantity estimation. Verify quantities against approved drawings and project specifications before procurement or construction.
This calculator provides quantity and preliminary cost estimation. Structural design, material specifications and final quantities must be verified against project drawings, specifications and applicable engineering standards.